Home News Publications Consultations Application Forms Vacancies Contact Us

Bathing Water Data: 2009

Bathing Water Site: Fraserburgh (Tiger Hill)
Grid Reference: NK00516564
EU Bathing Water (Identified Site)

click here to view map of beach area Map of beach area

Improvement Plan : Click Here Improvement Plan

Fraserburgh (Tiger Hill)
Fraserburgh (Tiger Hill) Results
Date Total
Coliforms
(colonies/100ml)
Faecal
Coliforms
(colonies/100ml)
Faecal
Streptococci
(colonies/100ml)
Abnormal
Weather
Waiver
20-May-2009194 (G)132 (M)6 (G)-
 Good : Mandatory Quality
2-Jun-200974 (G)48 (G)40 (G)-
 Excellent : Guideline Quality
10-Jun-200976 (G)76 (G)8 (G)-
 Excellent : Guideline Quality
15-Jun-200936 (G)8 (G)13 (G)-
 Excellent : Guideline Quality
23-Jun-2009232 (G)24 (G)31 (G)-
 Excellent : Guideline Quality
30-Jun-200914 (G)6 (G)4 (G)-
 Excellent : Guideline Quality
2-Jul-2009<2 (G)<2 (G)2 (G)-
 Excellent : Guideline Quality
5-Jul-20091800 (M)700 (M)210-
 Good : Mandatory Quality
8-Jul-2009600 (M)300 (M)230-
 Good : Mandatory Quality
14-Jul-20099800 (M)6700 (X)>1500-
 Poor : Failed Sample
Local SEPA staff have carried out an extensive investigation into the operation of the sewerage infrastructure at the time this poor result was recorded, and have concluded that the failure to meet mandatory standards cannot be attributed to any specific overflow of sewage or malfunctioning of the system. There were very heavy and localised downpours in the days prior to when the sample was taken, and whilst recorded rainfall totals were not sufficiently high to invoke an abnormal weather waiver it is possible that the heavy rain caused an increase in the amount of bacteria being transported to the bathing water via local watercourses.
20-Jul-200980 (G)80 (G)20 (G)-
 Excellent : Guideline Quality
22-Jul-2009138 (G)94 (G)35 (G)-
 Excellent : Guideline Quality
27-Jul-200922 (G)14 (G)13 (G)-
 Excellent : Guideline Quality
3-Aug-200976 (G)52 (G)150-
 Good : Mandatory Quality
5-Aug-20096 (G)<2 (G)21 (G)-
 Excellent : Guideline Quality
12-Aug-2009180 (G)100 (G)340-
 Good : Mandatory Quality
17-Aug-200946 (G)18 (G)21 (G)-
 Excellent : Guideline Quality
24-Aug-200982 (G)38 (G)100 (G)-
 Excellent : Guideline Quality
26-Aug-20096 (G)6 (G)1 (G)-
 Excellent : Guideline Quality
2-Sep-20098 (G)2 (G)1 (G)-
 Excellent : Guideline Quality
Number of Samples taken : 20


Historical Record of Compliance for Site : Fraserburgh (Tiger Hill)
1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000
image
image
image
image
image
image
image
image
image
image
image
image
image
2001 2002 2003 2004 2005 2006 2007 2008 2009  
image
image
image
image
image
image
image
image
-
Results from 2003 onwards are for the current Fraserburgh Tigerhill site, prior to this they are from the former Fraserburgh site.

Key for above
Pass-G Pass-G : Pass of Directive's Guideline Standards
Pass-M Pass-M : Pass of Directive's Mandatory Standards
Fail Fail : Fail of Directive's Standards
Not Done Not Done